Earth Support Corp

Middlesex CountyMassachusetts

Dracut, Massachusetts

Bedrock sits a median 20 ft down across 203 logs, shallower than the Massachusetts median of 24 ft. None of its 5 inventoried bridges is rated poor.

Median depth to bedrock

20 ft

middle half 10–50 ft · 203 logs

Bridges rated poor

0

of 5 inventoried

State resilience grants

$822K

4 awards on file

Construction projects

12

median $1.3M · public bid results

01 · Ground

Rock turns up a median 20 ft down

From 203 depth-to-rock records inside Dracut (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Dracut's logs reach rock between 10 and 50 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 20 ft
MA 24 ft
050100 ft
01020304050600–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 203 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–515
5–1022
10–2058
20–5054
50–10033
100+21

Rock within 10 ft

27%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 25% of logs here go past 50 ft.

02 · Money & permits

12 construction projects on file, median $1.3M — at or below the state's $1.5M

State resilience grant awards in Dracut
ProjectYearAward
Collinsville Dam Removal DesignFY2021$250K
Victory Lane Dam Removal Design and PermitFY2024$210K
Beaver Brook Dams FY23FY2023$188K
Design and Permitting for Collinsville Dam Removal ProjectFY2023$174K

Public construction projects

12

Median estimated value $1.3M, middle half $402K–$1.9M, against $1.5M across Massachusetts. Capped total $27.6M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

03 · Bridges

None of Dracut's 5 bridges is rated poor

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Dracut. Median age 171 years; 1 posted for weight.

20% good, 0% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good1 · 20%
  • Fair4 · 80%
  • Poor0 · 0%
n = 5 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19103
1950s1
1990s1

04 · Dams & disasters

Middlesex County has drawn $656M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Middlesex County-wide context, not a Dracut number.

FEMA Public Assistance, Middlesex County

$656M

Federal share obligated across 1,729 projects in 12 declared disasters since 2010. The largest category is emergency protective measures (97%); roads & bridges took $1.2M.
Dams, disasters & moving ground

05 · Next door

Dracut and the 6 towns that border it

A dash means no data for that layer, not zero.
Dracut compared with neighbouring towns
TownPoor bridgesRock depth
Dracut, MA0 / 520 ft
Lowell, MA10 / 8535 ft
Andover, MA7 / 3817 ft
Methuen, MA5 / 3123 ft
Tewksbury, MA4 / 1530 ft
Tyngsborough, MA0 / 1015 ft
Pelham, NH1 / 615 ft

Where these numbers come from

Method, sources & caveats

Dracut is the Census county subdivision 2501717475 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote