Timber lagging, install (and remove where required)
Left in place
SPL-LAGGING-LIPper SFmoderate evidence, fewer than 8 lettings
−40%vs the median bid
below 60% of bids
- Low bid
- $12.52
- Median bid
- $75.58
- Middle half
- $17.83–93.71
- 90th pct
- $171
- ESC published
- $41.50$32.50–56
- As a GC carries it (+10%)
- $45.65
5 lettings · 35 bids · 2015–26 · CTDOT, MassDOT, RIDOT, VTrans
