Median depth to bedrock
35 ft
middle half 16–59 ft · 105 logs
Bridges rated poor
10
of 85 inventoried · 1 closed
State resilience grants
$138K
1 award on file
Poor high-hazard dams
1
National Inventory of Dams
01 · Dams & disasters
1 high-hazard dam needs work
| Dam | Condition | Built |
|---|---|---|
| Guard Lock & GatesPawtucket Canal | Poor | 1848 |
High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.
FEMA Public Assistance, Middlesex County
$656M
02 · Bridges
10 of 85 bridges are rated poor — above the Massachusetts rate of 9%
28% good, 12% poor
- Good24 · 28%
- Fair51 · 60%
- Poor10 · 12%
Structures by decade built
▸ Show the numbers▾ Hide the numbers
| Built | Structures |
|---|---|
| pre-1910 | 18 |
| 1910s | 6 |
| 1920s | 1 |
| 1930s | 2 |
| 1940s | 1 |
| 1950s | 8 |
| 1960s | 19 |
| 1970s | 3 |
| 1980s | 4 |
| 1990s | 5 |
| 2000s | 2 |
| 2010s | 13 |
| 2020s | 3 |
The poor-rated bridges
| Carries | Over | Built | Daily traffic |
|---|---|---|---|
| I 495 SB | PAN AM | 1961 | 68,981 |
| I 495 NB | PAN AM | 1961 | 64,233 |
| BRIDGE ST | EASTERN CANAL | 1937 | 18,230 |
| NB LOWLL CON | I 495 | 1959 | 17,180 |
| ST 3 A/GORHAM ST | RIVER MEADOW BROOK | 1960 | 14,012 |
| SB LOWLL CON | I 495 | 1959 | 11,013 |
| BOYLSTON ST | I 495 | 1961 | 10,600 |
| LWLL CN B-10 | LOWEL CON RAMP B8 | 1959 | 7,860 |
| HALL ST | WESTERN CANAL | 1910 | 3,500 |
| SUFFOLK STclosed | NORTHERN CANAL | 1848 | 0 |
03 · Ground
Rock turns up a median 35 ft down
Half of Lowell's logs reach rock between 16 and 59 ft
▸ Show the numbers▾ Hide the numbers
| Depth to rock (ft) | Logs |
|---|---|
| 0–5 | 2 |
| 5–10 | 7 |
| 10–20 | 27 |
| 20–50 | 36 |
| 50–100 | 29 |
| 100+ | 4 |
Rock within 10 ft
11%
04 · Money & permits
39 construction projects on file, median $950K — at or below the state's $1.5M
| Project | Year | Award |
|---|---|---|
| Claypit Brook Climate Resilience Stormwater Management Capital Improvement Plan | FY2021 | $138K |
Public construction projects
39
05 · Next door
Lowell and the 5 towns that border it
| Town | Poor bridges | Rock depth |
|---|---|---|
| Lowell, MA | 10 / 85 | 35 ft |
| Chelmsford, MA | 3 / 51 | 22 ft |
| Billerica, MA | 0 / 23 | 18 ft |
| Tewksbury, MA | 4 / 15 | 30 ft |
| Tyngsborough, MA | 0 / 10 | 15 ft |
| Dracut, MA | 0 / 5 | 20 ft |
Where these numbers come from
Method, sources & caveats
Lowell is the Census county subdivision 2501737000 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).
- Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
- Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
- Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
- Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
- Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
- FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
- Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
- Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
- Data as of
- Sep 11, 2026
- Generated
- Sep 11, 2026
- Records
- 367,748
- Refresh
- Live pull · weekly
- U.S. Census Bureau cartographic boundary files — county subdivisions (2024, 1:500k)Public domain
- FHWA National Bridge Inventory (2025 delimited files)Public domain
- USACE National Inventory of DamsPublic domainHigh-hazard dams rated Poor or Unsatisfactory (live NID).
- USGS U.S. Landslide InventoryPublic domain
- MassGIS / Massachusetts Geological Survey — Bedrock Data PointsPublic recordBorings and well logs that reached rock (MassDEP well drillers, USGS, MWRA, MassDOT…); seismic/HVSR and map-derived shallow-bedrock/outcrop points excluded.
- NH DES Water Well Inventory, Maine Geological Survey Wells Database, Vermont DEC well recordsPublic recordBedrock wells only; driller-reported depth to bedrock / overburden thickness.
- OpenFEMA Public Assistance Funded Projects Details (v2)Public domain
- MA EEA / CZM grant awards — Dam & Seawall, MVP Action, CZM Coastal ResiliencePublic record
- Municipal open-data permit portals (Boston, Cambridge, Somerville, Providence, Portsmouth, others)Public recordOnly permits flagged as ground-related (retaining walls, excavation, foundations) are counted.
Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.