How long does a building permit take?

A plumbing or electrical permit typically comes back in 2 to 18 days; a new building waits 40 to 165. We timed 46,760 permits from application to issue in Cambridge, Somerville, Worcester and Hartford, and counted Boston’s workload too, straight from each city’s open-data portal.
  • Live · as of Sep 11, 2026
  • 120,213 records
  • 4 cities timed + Boston, Sep 2024–Aug 2026
  • 5 sources · method

New construction in Somerville

165days

Median wait from application to permit (n = 180). One in ten waited more than 451 days.

Fastest: Cambridge plumbing & gas

2 days

Median; 97% issued within 30 days

Permits timed

46,760

4 cities, Sep ’24–Aug ’26, plus 73,453 Boston permits counted

Cities covered

5

Cambridge, Somerville, Worcester and Hartford (speed) + Boston (volume)

Data as of Sep 11, 2026.

01 · Leaderboard

How long does a building permit take? The permit-speed leaderboard

Each row is one kind of permit in one city, ranked by the median number of calendar days between the application and the issued permit over the last 24 months (Sep 2024–Aug 2026). Plumbing and electrical permits clear in days to a few weeks. Anything that needs plan review, like new buildings, demolitions and large alterations, takes weeks to months, and the slow tail is long.

Plumbing and electrical permits take 2–18 days at the median; new buildings take 40–165

Median days from application to issue (dot), the middle half of permits (band) and the 90th percentile (whisker tip). The axis is logarithmic, so a week and a year both fit on it.
  • Cambridge
  • Somerville
  • Worcester
  • Hartford
median · middle half · 90th pct
01 wk1 mo4 mo16 mo
  1. CambridgePlumbing & gas
    2 d
  2. CambridgeStreet excavation (trench)
    3 d
  3. WorcesterRoof, siding & minor work
    4 d
  4. CambridgeElectrical
    5 d
  5. CambridgeRoof, siding & minor work
    7 d
  6. SomervilleElectrical
    7 d
  7. SomervillePlumbing & gas
    8 d
  8. CambridgeMechanical & sheet metal
    9 d
  9. WorcesterAll building permits
    11 d
  10. HartfordSolar installation
    13 d
  11. HartfordPlumbing & gas
    15 d
  12. CambridgeAll building permits
    16 d
  13. WorcesterAdditions & alterations
    18 d
  14. HartfordElectrical
    18 d
  15. CambridgeAdditions & alterations
    19 d
  16. SomervilleRoof, siding & minor work
    21 d
  17. HartfordAdditions & alterations
    22 d
  18. HartfordAll building permits
    22 d
  19. HartfordMechanical & sheet metal
    23 d
  20. WorcesterDemolition
    25 d
  21. HartfordRoof, siding & minor work
    27 d
  22. SomervilleAll building permits
    27 d
  23. WorcesterFoundations & retaining walls
    27 d
  24. CambridgeSolar installation
    29 d
  25. SomervilleAdditions & alterations
    36 d
  26. HartfordNew construction
    40 d
  27. CambridgeCertificate of occupancy
    40 d
  28. SomervilleMechanical & sheet metal
    41 d
  29. SomervilleCertificate of occupancy
    46 d
  30. CambridgeDemolition
    62 d
  31. WorcesterNew construction
    64 d
  32. CambridgeNew construction
    118 d
  33. SomervilleDemolition
    118 d
  34. SomervilleNew construction
    165 d
n = 44,317 permits in 34 city × class groups (groups under 30 permits hidden)Source: Municipal open-data portalsCSV
▸ Show the numbers
CityPermit classnMedianp25p75p90≤ 30 days
Cambridge, MAPlumbing & gas4,1022 days1 day4 days8 days97%
Cambridge, MAStreet excavation (trench)2,4053 days1 day6 days18 days93%
Worcester, MARoof, siding & minor work3,6284 days1 day13 days28 days91%
Cambridge, MAElectrical5,2465 days2 days9 days19 days95%
Cambridge, MARoof, siding & minor work8007 days2 days14 days28 days92%
Somerville, MAElectrical3,6407 days3 days20 days61 days82%
Somerville, MAPlumbing & gas2,5628 days4 days15 days34 days89%
Cambridge, MAMechanical & sheet metal1,6619 days4 days23 days46 days82%
Worcester, MAAll building permits9,39811 days4 days27 days56 days78%
Hartford, CTSolar installation59013 days8 days29 days51 days77%
Hartford, CTPlumbing & gas1,63715 days8 days30 days68 days75%
Cambridge, MAAll building permits4,08616 days6 days36 days71 days70%
Worcester, MAAdditions & alterations4,18518 days7 days37 days72 days69%
Hartford, CTElectrical2,38618 days7 days42 days98 days65%
Cambridge, MAAdditions & alterations3,19119 days7 days39 days71 days67%
Somerville, MARoof, siding & minor work1,21521 days15 days34 days65 days71%
Hartford, CTAdditions & alterations2,40222 days11 days51 days94 days60%
Hartford, CTAll building permits2,51422 days11 days51 days95 days60%
Hartford, CTMechanical & sheet metal97823 days10 days53 days103 days59%
Worcester, MADemolition7925 days10 days53 days108 days58%
Hartford, CTRoof, siding & minor work6827 days13 days49 days90 days54%
Somerville, MAAll building permits3,83227 days17 days56 days120 days56%
Worcester, MAFoundations & retaining walls4527 days15 days64 days142 days56%
Cambridge, MASolar installation22129 days14 days49 days80 days52%
Somerville, MAAdditions & alterations1,42636 days22 days71 days128 days43%
Hartford, CTNew construction4440 days8 days70 days150 days48%
Cambridge, MACertificate of occupancy38540 days18 days94 days204 days41%
Somerville, MAMechanical & sheet metal42841 days23 days74 days172 days36%
Somerville, MACertificate of occupancy31046 days23 days87 days247 days36%
Cambridge, MADemolition14262 days40 days129 days218 days11%
Worcester, MANew construction19664 days41 days120 days212 days16%
Cambridge, MANew construction95118 days60 days186 days248 days6%
Somerville, MADemolition70118 days79 days210 days283 days3%
Somerville, MANew construction180165 days97 days305 days451 days7%

Look up any city and permit type

Search by city or permit class. The last two columns split the 24 months in half, so you can see which way each one is moving.

34 of 34 rows

Permit speed by city and permit class
CambridgePlumbing & gas2 days
CambridgeStreet excavation (trench)3 days
WorcesterRoof, siding & minor work4 days
CambridgeElectrical5 days
CambridgeRoof, siding & minor work7 days
SomervilleElectrical7 days
SomervillePlumbing & gas8 days
CambridgeMechanical & sheet metal9 days
WorcesterAll building permits11 days
HartfordSolar installation13 days
HartfordPlumbing & gas15 days
CambridgeAll building permits16 days
Page 1 / 3
34 city × class groups · Sep 2024–Aug 2026Source: Municipal open-data portalsCSV

02 · Trend

Are building permits getting faster?

Not across the board. Comparing the latest 12 months with the 12 before, 10 of 28 permit types got slower, 7 got faster and 11 held steady (we count a change only if it is at least 2 days and at least 10%). Every panel below uses the same scale, so you can compare the cities directly.

Worcester’s typical building permit went from 7 to 14 days; Cambridge’s fell from 19 to 14

Quarterly median days from application to issue for all building permits, by the quarter the permit was issued, 2021 Q1 onward. The shaded band is the middle half of permits.

Cambridge, MA

latest 13 d

Median 19 → 14 days, prior vs latest 12 months

020406080 d202120222023202420252026

Somerville, MA

latest 26 d

Median 28 → 27 days, prior vs latest 12 months

020406080 d202120222023202420252026

Worcester, MA

latest 13 d

Median 7 → 14 days, prior vs latest 12 months

020406080 d202120222023202420252026

Hartford, CT

latest 19 d

Median 21 → 23 days, prior vs latest 12 months

020406080 d202120222023202420252026
n = 55,126 building permits · quarters with < 30 permits omittedSource: Municipal open-data portalsCSV
▸ Show the numbers
City2021 Q12021 Q22021 Q32021 Q42022 Q12022 Q22022 Q32022 Q42023 Q12023 Q22023 Q32023 Q42024 Q12024 Q22024 Q32024 Q42025 Q12025 Q22025 Q32025 Q42026 Q12026 Q2
Cambridge14141426282027221922222214151619201817171713
Somerville26232227161820161820262825292926342730272826
Worcester7987812131597776696671615913
Hartford91319861319321929251430261920272121282919

10 permit types got slower in the past year and 7 got faster

Median days in the prior 12 months (ring) and the latest 12 months (dot), sorted from the biggest slowdown to the biggest speed-up in days. Types that held steady are folded away.
  • Prior 12 months
  • Latest 12 months
  • Colour = city, as above
01 wk1 mo4 mo
  1. SomervilleNew construction
    +50 d
  2. CambridgeNew construction
    +46 d
  3. CambridgeSolar installation
    +14 d
  4. CambridgeDemolition
    +13 d
  5. WorcesterNew construction
    +10 d
  6. HartfordRoof, siding & minor work
    +7 d
  7. WorcesterAdditions & alterations
    +6 d
  8. WorcesterRoof, siding & minor work
    +5 d
  9. CambridgeElectrical
    +4 d
  10. SomervillePlumbing & gas
    +2 d
  11. HartfordMechanical & sheet metal
    −2 d
  12. HartfordPlumbing & gas
    −3 d
  13. CambridgeMechanical & sheet metal
    −3 d
  14. CambridgeAdditions & alterations
    −3 d
  15. CambridgeRoof, siding & minor work
    −4 d
  16. SomervilleAdditions & alterations
    −4 d
  17. WorcesterDemolition
    −10 d
28 city × class groups with ≥ 30 permits in both yearsSource: Municipal open-data portalsCSV
▸ Show the numbers
CityPermit classPrior 12 moLatest 12 moChange (days)
SomervilleNew construction124 days174 days+50
CambridgeNew construction87 days132 days+46
CambridgeSolar installation23 days37 days+14
CambridgeDemolition55 days68 days+13
WorcesterNew construction57 days67 days+10
HartfordRoof, siding & minor work26 days33 days+7
WorcesterAdditions & alterations15 days21 days+6
WorcesterRoof, siding & minor work2 days7 days+5
CambridgeElectrical3 days7 days+4
SomervilleCertificate of occupancy44 days48 days+4
SomervillePlumbing & gas7 days9 days+2
HartfordAdditions & alterations21 days23 days+2
CambridgeCertificate of occupancy40 days40 days+1
CambridgePlumbing & gas2 days2 days±0
CambridgeStreet excavation (trench)3 days3 days±0
SomervilleElectrical7 days7 days±0
HartfordSolar installation13 days13 days±0
SomervilleRoof, siding & minor work21 days21 days±0
SomervilleMechanical & sheet metal41 days41 days±0
HartfordElectrical19 days18 days−1
SomervilleDemolition119 days118 days−1
HartfordMechanical & sheet metal25 days22 days−2
HartfordPlumbing & gas17 days14 days−3
CambridgeMechanical & sheet metal11 days7 days−3
CambridgeAdditions & alterations21 days18 days−3
CambridgeRoof, siding & minor work9 days5 days−4
SomervilleAdditions & alterations38 days34 days−4
WorcesterDemolition28 days18 days−10

03 · Workload

How busy is Boston’s permit counter?

Boston publishes when each permit was issued but not when it was applied for, so we can’t time its permits. We can measure the workload instead. Inspectional Services issued 73,453 permits in the last 24 months, about 3,060 a month. 29,127 of them were building permits, carrying $8.7B of declared construction value.

Boston issues about 3,100 permits a month; electrical, plumbing and gas work is 57% of them

Permits issued per month by type, last 36 months.
  • Building (short form, long form, new)
  • Electrical, plumbing & gas
  • Occupancy & other
01,0002,0003,0004,000Sep ’23Dec ’23Mar ’24Jun ’24Sep ’24Dec ’24Mar ’25Jun ’25Sep ’25Dec ’25Mar ’26Jun ’26
n = 110,961 permitsSource: City of Boston, Approved Building PermitsCSV
▸ Show the numbers
MonthBuildingTradesOccupancy & otherTotal
Sep 20231,3231,9261213,370
Oct 20231,4641,9131213,498
Nov 20231,2401,7991123,151
Dec 20238451,6631092,617
Jan 20241,1621,8791053,146
Feb 20241,0221,7111272,860
Mar 20241,3051,8331143,252
Apr 20241,2501,9851183,353
May 20241,3551,7081043,167
Jun 20241,2031,841803,124
Jul 20241,2111,4781202,809
Aug 20241,2021,868913,161
Sep 20241,4031,8691123,384
Oct 20241,3211,9991403,460
Nov 20241,1111,694852,890
Dec 20241,0771,578842,739
Jan 20251,1871,708962,991
Feb 20258481,468992,415
Mar 20251,1121,7441192,975
Apr 20251,1771,556912,824
May 20251,3371,5551243,016
Jun 20251,2161,5831332,932
Jul 20251,5541,860993,513
Aug 20251,3721,9671143,453
Sep 20251,4251,6951043,224
Oct 20251,5672,213983,878
Nov 20251,1361,570892,795
Dec 20251,0031,6731062,782
Jan 20269331,576942,603
Feb 20268651,648932,606
Mar 20261,1711,905813,157
Apr 20261,2731,832823,187
May 20261,1941,765973,056
Jun 20261,2731,6821163,071
Jul 20261,3291,9351223,386
Aug 20261,2431,7351383,116

October is the busiest month and February the quietest, but the swing is small

Average share of a year’s permits issued in each month, 2019–2025. The dashed line is an even 1/12.
0%2%4%6%8%10%evenJanFebMarAprMayJunJulAugSepOctNovDec
7 complete yearsSource: City of Boston
▸ Show the numbers
MonthAvg share of yearAvg permits
Jan8.4%3,183
Feb7.4%2,795
Mar8.5%3,235
Apr7.5%2,935
May7.9%3,066
Jun8.4%3,234
Jul8.5%3,244
Aug9.2%3,518
Sep9.0%3,425
Oct9.6%3,660
Nov8.2%3,116
Dec7.5%2,861

Volume fell to 32,112 in 2020 and has held near 37,000 since

All permits issued per calendar year, 2019–2025 (complete years only).
010,00020,00030,00040,00050,0002019202020212022202320242025
n = 267,905 permitsSource: City of Boston
▸ Show the numbers
YearAll permitsBuilding permits
201945,29116,009
202032,11211,740
202137,89715,051
202239,91815,137
202338,54415,100
202437,34514,622
202536,79814,934

Dorchester (Codman Sq.) pulls the most building permits in Boston

Building permits issued by ZIP code (named for its main neighborhood), Sep ’24–Aug ’26. Declared construction value on the right; one large project can dominate a ZIP’s total.
  1. Dorchester (Codman Sq.)02124
    2,149$377.5M
  2. Hyde Park02136
    1,990$360.6M
  3. West Roxbury02132
    1,917$164.9M
  4. Jamaica Plain02130
    1,915$1.5B
  5. Back Bay / Bay Village02116
    1,719$2.3B
  6. Roslindale02131
    1,715$263.6M
  7. South Boston02127
    1,420$978M
  8. Brighton02135
    1,343$1.2B
  9. East Boston02128
    1,275$557.9M
  10. South End02118
    1,190$856.8M
  11. Dorchester (Uphams Corner)02125
    1,128$582.3M
  12. Mattapan02126
    1,123$177.9M
  13. Fenway / Longwood02115
    980$1.6B
  14. Roxbury02119
    977$649M
  15. Charlestown02129
    972$585.8M
n = 29,081 building permits in 30 ZIP codesSource: City of BostonCSV
▸ Show the numbers
NeighborhoodZIPBuilding permitsNew buildingsAll permitsDeclared value
Dorchester (Codman Sq.)021242,149274,726$377.5M
Hyde Park021361,990244,327$360.6M
West Roxbury021321,917114,263$164.9M
Jamaica Plain021301,915224,550$1.5B
Back Bay / Bay Village021161,71924,643$2.3B
Roslindale021311,715253,889$263.6M
South Boston021271,420233,668$978M
Brighton021351,343293,300$1.2B
East Boston021281,275473,481$557.9M
South End021181,19032,956$856.8M
Dorchester (Uphams Corner)021251,128202,747$582.3M
Mattapan021261,123102,478$177.9M
Fenway / Longwood0211598012,912$1.6B
Roxbury02119977162,379$649M
Charlestown0212997252,343$585.8M
Dorchester (Grove Hall)02121906522,022$699.1M
Dorchester (Neponset)02122870161,883$223.8M
Fenway / Kenmore0221566402,015$3B
Financial District0211065612,518$1.1B
West End / Beacon Hill0211465321,958$640.3M
Beacon Hill0210859011,493$675.4M
Allston02134581131,569$3B
Seaport0221055502,224$1.2B
Downtown / Waterfront0210943501,263$268M
Chinatown / Leather District0211134211,014$1B
Mission Hill021203305859$615.1M
North End021132981576$55.5M
Chestnut Hill024671580359$32M
Back Bay (Prudential)021991460657$155.8M
Allston (Harvard)02163840187$213.1M

04 · The work

What are all these permits for?

Most of a building department’s paperwork is trades and alterations. New buildings are only 0.5%2.1% of permits issued, yet they take the longest to clear. The ground work that comes before a foundation has its own, much smaller, permit trail.

Trades and alterations make up most of the permits; new buildings are a sliver

Share of permits issued by type of work, Sep ’24–Aug ’26.
  • New construction
  • Alterations, repairs & minor building
  • Electrical, plumbing & mechanical
  • Street excavation & foundations
  • Demolition
  • Solar & occupancy
Cambridge18,259 permits
Somerville10,842 permits
Worcester9,522 permits · building permits only
Hartford8,137 permits

Worcester’s open data covers building permits only (its trade permits sit in separate layers), so its bar has no trades. Hartford’s feed has no street-opening permits.

n = 46,760 permitsSource: Municipal open-data portals
▸ Show the numbers
CityNew constructionAlterations, repairs & minor buildingElectrical, plumbing & mechanicalStreet excavation & foundationsDemolitionSolar & occupancyTotal
Cambridge953,99111,0092,41614260618,259
Somerville1803,6526,63007031010,842
Worcester1969,2020457909,522
Hartford442,4705,0014285908,137

Ground work: street digs clear in 3 days, while stand-alone foundation permits take about 4 weeks

The permits that touch the ground itself: trenches in the public way, foundations, retaining walls, excavation and borings.

Cambridge · Street excavation permits

3 days

  • 2,405 issued, 93% within 30 days
  • 1 in 10 took more than 18 days

Worcester · Foundation & retaining-wall permits

27 days

  • 45 issued (29 retaining walls, 16 foundation)
  • Middle half 15–64 days
  • 1 in 10 took more than 142 days

Boston · Excavation, boring & test-pit permits

53 / yr

  • 2025, down from 139 in 2019
  • Issue dates only, so not timed

Boston short-form excavation, boring & test-pit permits (work type SITE) per year

0501001502019202020212022202320242025
What this leaves out. Most foundation and earth-retention work is permitted inside the main building permit, so these stand-alone counts are a floor, not the size of the market. Cambridge dewatering (6), Cambridge stormwater (5) and Hartford commercial foundation permit (4) had too few permits to time.
2,465 ground permits across 3 cities, plus 102 in BostonSource: Municipal open-data portals
▸ Show the numbers
CityPermit typePermitsMedian days
CambridgeExcavation2,4053 days
WorcesterRetaining Walls29n < 30
WorcesterFoundation16n < 30
CambridgeDewatering6n < 30
CambridgeStormwater5n < 30
HartfordCommercial Foundation Permit4n < 30
BostonExcavation, borings & test pits (SITE)102not published

05 · City by city

Building permit times, city by city

The short answer for each city, with the quirks of its data.

Cambridge, MA

How long does a building permit take in Cambridge?

About 16 days at the median. Over Sep 2024–Aug 2026, 70% of Cambridge’s 4,086 building permits were issued within 30 days of application, and one in ten took longer than 71 days.

New build
118 days
n = 95
Add / alter
19 days
n = 3,191
Roof & minor
7 days
n = 800

Cambridge's Permit Finder merges every ViewPoint permit type into one feed; the start date is the applicant's submission date. Street excavation permits are Department of Public Works street openings, not building foundations.

Somerville, MA

How long does a building permit take in Somerville?

About 27 days at the median. Over Sep 2024–Aug 2026, 56% of Somerville’s 3,832 building permits were issued within 30 days of application, and one in ten took longer than 120 days.

New build
165 days
n = 180
Add / alter
36 days
n = 1,426
Roof & minor
21 days
n = 1,215

Somerville's Citizenserve feed replaced the older Permits dataset (which stopped in May 2023). Its building permits carry a residential/commercial subtype; 'Other' subtypes count toward all building permits only.

Worcester, MA

How long does a building permit take in Worcester?

About 11 days at the median. Over Sep 2024–Aug 2026, 78% of Worcester’s 9,398 building permits were issued within 30 days of application, and one in ten took longer than 56 days.

New build
64 days
n = 196
Add / alter
18 days
n = 4,185
Roof & minor
4 days
n = 3,628

Worcester's layer covers building permits only (trade permits are separate). Permits filed in the city's newer system arrive without a work type ('N/A'); they count toward all building permits only.

Hartford, CT

How long does a building permit take in Hartford?

About 22 days at the median. Over Sep 2024–Aug 2026, 60% of Hartford’s 2,514 building permits were issued within 30 days of application, and one in ten took longer than 95 days.

New build
40 days
n = 44
Add / alter
22 days
n = 2,402
Roof & minor
27 days
n = 68

Hartford's start date is the date the record was opened in Accela, which can be later than the first submission for resubmitted plans.

Boston is covered for workload only (see section 3). Other New England cities don’t publish both an application date and an issue date in open data yet. When one does, it will be added here.

Where these numbers come from

Method, sources & caveats

What we measure. For every permit a city issued in the window, we count calendar days from the date the application was submitted (Cambridge, Somerville and Worcester) or opened (Hartford) to the date the permit was issued. Weekends and holidays count. A same-day permit is 0 days. The median is the middle permit, and p25, p75 and p90 are the permits a quarter, three quarters and nine tenths of the way along the queue.

Permit classes. Each city names its permit types differently, so we map them to shared classes: new construction, additions & alterations, roof/siding & minor work, demolition, foundations, street excavation, electrical, plumbing & gas, mechanical, solar and certificates of occupancy. “All building permits” rolls up the structural building classes and leaves out trades, demolition, solar and street work. The mapping lives in the open pipeline and the raw type is in every CSV.

What’s left out. No names, addresses, parcels, descriptions or permit numbers are published, only the permit type, the class, the two dates and the day count. The data refreshes weekly from each portal. Nothing here is legal or permitting advice. Ask the building department for current review times.

  • Days = calendar days from the application (submission) date to the issue date, for permits issued Sep 2024 through Aug 2026 (24 full months). The current partial month is left out.
  • Only permits that were actually issued are timed. Withdrawn, denied and still-pending applications are not in the medians, so real-world waits for hard jobs are longer than shown.
  • Records with an issue date before the application date, or more than 1,095 days after it (usually renewals or re-opened records), are dropped: Cambridge 39; Somerville 58; Worcester 0; Hartford 385.
  • City × permit-class groups with fewer than 30 issued permits are not shown (3 suppressed). Monthly sparkline points need at least 10 permits.
  • Clocks differ by city: some start when an application is submitted online, others when staff open the record, and every city counts time spent waiting on the applicant (missing documents, fees, revisions). Compare shapes, not single days.
  • Boston publishes issue dates but not application dates, so Boston appears as a measure of how busy the counter is (permits issued per month), not of speed.
  • Cambridge's Permit Finder merges every ViewPoint permit type into one feed; the start date is the applicant's submission date. Street excavation permits are Department of Public Works street openings, not building foundations.
  • Somerville's Citizenserve feed replaced the older Permits dataset (which stopped in May 2023). Its building permits carry a residential/commercial subtype; 'Other' subtypes count toward all building permits only.
  • Worcester's layer covers building permits only (trade permits are separate). Permits filed in the city's newer system arrive without a work type ('N/A'); they count toward all building permits only.
  • Hartford's start date is the date the record was opened in Accela, which can be later than the first submission for resubmitted plans.
  • Not legal or permitting advice. Check the local building department for current requirements and review times.

Groups with fewer than 30 records are suppressed so no single project or firm can be singled out.

Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
120,213
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote