Bedrock sits a median 15 ft down across 163 logs, shallower than the Massachusetts median of 24 ft. 2 of its 23 inventoried bridges are rated poor (9%, against 9% statewide).

Median depth to bedrock

15 ft

middle half 8–30 ft · 163 logs

Bridges rated poor

2

of 23 inventoried · 1 closed

State resilience grants

$322K

1 award on file

Construction projects

13

median $1.6M · public bid results

01 · Ground

Rock turns up a median 15 ft down

From 163 depth-to-rock records inside Wilmington (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Wilmington's logs reach rock between 8 and 30 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 15 ft
MA 24 ft
02040 ft
02040600–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 163 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–512
5–1034
10–2044
20–5060
50–10013
100+0

Rock within 10 ft

37%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 6% of logs here go past 50 ft.

02 · Money & permits

13 construction projects on file, median $1.6M — above the state's $1.5M

State resilience grant awards in Wilmington
ProjectYearAward
Building the Climate Resilience of the Martins Brook FloodwayFY2025$322K

Public construction projects

13

Median estimated value $1.6M, middle half $577K–$5.6M, against $1.5M across Massachusetts. Capped total $78.0M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

03 · Bridges

2 of 23 bridges are rated poor — about the same as the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Wilmington. Median age 68 years; 3 posted for weight; 1 closed.

17% good, 9% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good4 · 17%
  • Fair17 · 74%
  • Poor2 · 9%

Structures by decade built

0246810121920s1950s1960s1970s1980s1990s2000s2020s
n = 23 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1920s2
1950s12
1960s1
1970s2
1980s2
1990s1
2000s2
2020s1

The poor-rated bridges

Bridges rated poor in Wilmington
CarriesOverBuiltDaily traffic
ST129 LOWELL STpostedI 93195726,250
ST 38 MAIN STpostedMBTA/BMRR192812,500
Every poor bridge in New England

04 · Dams & disasters

Middlesex County has drawn $656M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Middlesex County-wide context, not a Wilmington number.

FEMA Public Assistance, Middlesex County

$656M

Federal share obligated across 1,729 projects in 12 declared disasters since 2010. The largest category is emergency protective measures (97%); roads & bridges took $1.2M.
Dams, disasters & moving ground

05 · Next door

Wilmington and the 7 towns that border it

A dash means no data for that layer, not zero.
Wilmington compared with neighbouring towns
TownPoor bridgesRock depth
Wilmington, MA2 / 2315 ft
Andover, MA7 / 3817 ft
Billerica, MA0 / 2318 ft
Woburn, MA2 / 2122 ft
Tewksbury, MA4 / 1530 ft
Burlington, MA3 / 1216 ft
Reading, MA1 / 618 ft
North Reading, MA1 / 615 ft

Where these numbers come from

Method, sources & caveats

Wilmington is the Census county subdivision 2501780230 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote