1 high-hazard dam is rated in poor or unsatisfactory condition. Bedrock sits a median 30 ft down across 158 logs, deeper than the Massachusetts median of 24 ft.

Median depth to bedrock

30 ft

middle half 14–68 ft · 158 logs

Bridges rated poor

2

of 11 inventoried

State resilience grants

$123K

1 award on file

Poor high-hazard dams

1

National Inventory of Dams

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Middlesex County-wide context, not a Hudson number.
High-hazard dams in poor condition in Hudson
DamConditionBuilt
Main Street DamDanforth BrookPoor1882

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Middlesex County

$656M

Federal share obligated across 1,729 projects in 12 declared disasters since 2010. The largest category is emergency protective measures (97%); roads & bridges took $1.2M.
Dams, disasters & moving ground

02 · Ground

Rock turns up a median 30 ft down

From 158 depth-to-rock records inside Hudson (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Hudson's logs reach rock between 14 and 68 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 30 ft
MA 24 ft
050100 ft
010203040500–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 158 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–54
5–1019
10–2033
20–5046
50–10038
100+18

Rock within 10 ft

18%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 34% of logs here go past 50 ft.

03 · Money & permits

10 construction projects on file, median $1.8M — above the state's $1.5M

State resilience grant awards in Hudson
ProjectYearAward
Main Street Dam Removal Feasibility AssessmentFY2026$123K

Public construction projects

10

Median estimated value $1.8M, middle half $266K–$12.0M, against $1.5M across Massachusetts. Capped total $59.0M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

04 · Bridges

2 of 11 bridges are rated poor — above the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Hudson. Median age 63 years; 2 posted for weight.

36% good, 18% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good4 · 36%
  • Fair5 · 45%
  • Poor2 · 18%
n = 11 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1910s1
1920s1
1960s4
1990s1
2000s2
2010s2

The poor-rated bridges

Bridges rated poor in Hudson
CarriesOverBuiltDaily traffic
I 495 NBASSABET RIVER196355,989
I 495 SBASSABET RIVER196347,879
Every poor bridge in New England

05 · Next door

Hudson and the 5 towns that border it

A dash means no data for that layer, not zero.
Hudson compared with neighbouring towns
TownPoor bridgesRock depth
Hudson, MA2 / 1130 ft
Marlborough, MA1 / 2215 ft
Berlin, MA0 / 1215 ft
Stow, MA2 / 735 ft
Sudbury, MA1 / 640 ft
Bolton, MA1 / 616 ft

Where these numbers come from

Method, sources & caveats

Hudson is the Census county subdivision 2501731540 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly