1 high-hazard dam is rated in poor or unsatisfactory condition. Bedrock sits a median 15 ft down across 204 logs, shallower than the Massachusetts median of 24 ft.

Median depth to bedrock

15 ft

middle half 8–25 ft · 204 logs

Bridges rated poor

1

of 22 inventoried

Poor high-hazard dams

1

National Inventory of Dams

Construction projects

19

median $2.2M · public bid results

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Middlesex County-wide context, not a Marlborough number.
High-hazard dams in poor condition in Marlborough
DamConditionBuilt
Hager Pond DamHop BrookUnsatisfactory1710

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Middlesex County

$656M

Federal share obligated across 1,729 projects in 12 declared disasters since 2010. The largest category is emergency protective measures (97%); roads & bridges took $1.2M.
Dams, disasters & moving ground

02 · Ground

Rock turns up a median 15 ft down

From 204 depth-to-rock records inside Marlborough (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Marlborough's logs reach rock between 8 and 25 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 15 ft
MA 24 ft
02040 ft
0204060800–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 204 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–520
5–1040
10–2063
20–5071
50–1009
100+1

Rock within 10 ft

34%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 4% of logs here go past 50 ft.

03 · Bridges

1 of 22 bridges are rated poor — below the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Marlborough. Median age 58 years; 1 posted for weight.

18% good, 5% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good4 · 18%
  • Fair17 · 77%
  • Poor1 · 5%

Structures by decade built

0510151960s1970s1980s2000s2010s
n = 22 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1960s14
1970s2
1980s1
2000s2
2010s3

The poor-rated bridges

Bridges rated poor in Marlborough
CarriesOverBuiltDaily traffic
I 495 SBBERLIN RD196342,765
Every poor bridge in New England

04 · Money & permits

19 construction projects on file, median $2.2M — above the state's $1.5M

Public construction projects

19

Median estimated value $2.2M, middle half $1.4M–$14.4M, against $1.5M across Massachusetts. Capped total $160M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

05 · Next door

Marlborough and the 6 towns that border it

A dash means no data for that layer, not zero.
Marlborough compared with neighbouring towns
TownPoor bridgesRock depth
Marlborough, MA1 / 2215 ft
Framingham, MA3 / 4924 ft
Southborough, MA0 / 2115 ft
Northborough, MA2 / 1518 ft
Berlin, MA0 / 1215 ft
Hudson, MA2 / 1130 ft
Sudbury, MA1 / 640 ft

Where these numbers come from

Method, sources & caveats

Marlborough is the Census county subdivision 2501738715 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.