Price checkUnderpinningPer CY

Underpinning, pit-and-pour (hand-dug sequential pits, concrete)

What bidders priced on like-for-like public pay items, from public agency bid tabulations restated to 2026 dollars and a typical job, against ESC’s published rate as a general contractor carries it.

Published rate

−41%

ESC’s rate as a GC carries it, against the median public bid

ESC’s rate as a GC carries it is $5,005/CY −41% vs the median public bid, and below 65% of 20 public bids on 4 lettings (2015–2023).

  • Limited evidence: 4 lettings
  • Bids all years
  • New England agencies
  • Restated to 2026 dollars
  • Middle half of bids
  • Median bid
  • Typical low bid
  • ESC rate, as a GC carries it (gold rule: our low–high range)
ESC published rate
$4,550/CY
Range $3,550–6,450
As a GC carries it
$5,005/CY
Published rate +10% · $3,905–7,095
Median public bid
$8,432/CY
Recent lettings count more; each letting once
Middle half of bids
$4,041–9,954/CY
25th to 75th percentile
Typical low bid
$6,086/CY
Median of each pay line’s lowest bid
Pay lines where ESC is under even the lowest bid
1 of 4
ESC’s carried rate below every bid on the line

Price book note: Per CY of underpinning concrete placed, incl. hand excavation, pit shoring and dry-pack.

This rate in the price book

01 · The field

Every public bid

Each dot is one bidder’s price on one public pay line for this work: 20 bids on 4 lettings, 2015–2023. Every price is restated to 2026 dollars and a typical job size, so it compares like for like with ESC’s published rate. Point at or focus a dot for its year, agency and rank; the other bids on its pay line are ringed.

  • Public bid
  • Older lettings fainter
  • Middle half of bids
  • Median bid
  • Typical low bid
  • ESC as a GC carries it (gold rule: low–high)

n = 20 bids · 4 lettings · 4 pay linesSource: public agency bid tabulations

Show all 20 bids

02 · Time

Over time

  • Public bid
  • Year’s weighted median
  • ESC as a GC carries it

Each dot is one bid, placed by the year its letting opened. Every price is restated to 2026 dollars and a typical job, so a price bid years ago and one bid last season compare like for like. Ink ticks: each year’s weighted median, where the year has at least 3 bids.

n = 20 bids · 3 years with bidsSource: public agency bid tabulations

Show the numbers

03 · Pay lines

Pay line by pay line

Every public pay line behind this rate. No bidder, project, contract or town is shown: a line is a year, an agency, a printed quantity, a count of bidders and prices.

ESC’s carried rate would have been the lowest price on 1 of 4 pay lines.

Every public pay line for Underpinning, pit-and-pour (hand-dug sequential pits, concrete), newest first: year, agency, printed quantity, bidders, and the lowest, median and highest bid restated to 2026 dollars, with where ESC’s rate as a GC carries it would have ranked.
YearAgencyQuantityBiddersLowMedianHighBids on the line against ESCESC would have ranked
2023CTDOT165 CY3$8,365$9,574$10,942#1of 4: the lowest price on the line
2018NHDOT4 CY5$3,609$4,330$5,774#5of 6
2015NHDOT18 CY7$1,373$2,589$3,923#8of 8
2015NHDOT6 CY5$805$2,739$4,027#6of 6

Newest first · 4 of 4 pay lines

Low, median and high are restated to 2026 dollars and a typical job; the quantity is as printed. The strip shows each bid on the line (dots), its median (ink tick) and ESC’s rate as a GC carries it (diamond), on one scale for every line. “ESC would have ranked” counts ESC as one more bidder on the line.

04 · Agencies

By agency

The same comparison inside each agency’s own lettings.

Underpinning, pit-and-pour (hand-dug sequential pits, concrete) by agency: lettings, bids, median bid, the field of bids against ESC’s rate as a GC carries it, ESC against the median and the weighted share of bids above ESC.
AgencyLettingsBidsMedian bid /CYField and ESCESC vs medianBids above ESC
All agencies420$8,432−41%65%
New Hampshire Department of TransportationNHDOT317$3,774+33%10%
Connecticut Department of TransportationCTDOT13Too few lettings to compare
  • Middle half of bids
  • Median bid
  • ESC rate, as a GC carries it (gold rule: our low–high range)

An agency is compared on its own from 3 lettings. Every agency’s bids count in the charts and pay lines above.

Where these numbers come from

Basis

Underpinning, pit-and-pour (hand-dug sequential pits, concrete). 20 public bids on 4 lettings and 4 pay lines, from NHDOT and CTDOT (2015–2023; every year is used, because bids from 2019 on leave fewer than 8 lettings). Every bid is restated to 2026 dollars and to a typical ESC job of 5.5 CY. A letting’s weight halves every 3 years, and each letting counts once, however many bidders it drew.

ESC’s rate is compared as a general contractor carries it: the published typical rate plus 10%, because a public pay line is the general contractor’s price, markup included.

Limited evidence: 4 lettings. A comparison is published from 3 lettings; 8 or more count as strong evidence.

Published by Earth Support Corp. from public agency bid tabulations. These are budget comparisons, not a quote or an offer: ESC quotes its earth-support scope to general contractors as a subcontractor, from your drawings.

Send drawings. Get a firm, line-item quote within 3 business days.

Rev 1 · valid through Dec 13, 2026

Get a firm quote in 3 business days

Or email plans and your bid date to bids@earthsupportcorp.com.

CallEmailStart Quote