1 high-hazard dam is rated in poor or unsatisfactory condition. 3 of its 37 inventoried bridges are rated poor (8%, against 4% statewide).

Median depth to bedrock

18 ft

middle half 8–40 ft · 615 logs

Bridges rated poor

3

of 37 inventoried · 3 closed

Poor high-hazard dams

1

National Inventory of Dams

Mapped landslides

43

USGS inventory points

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Caledonia County-wide context, not a Lyndon number.
High-hazard dams in poor condition in Lyndon
DamConditionBuilt
Institute PondPassumpsic River-TrPoor1911

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Caledonia County

$38.0M

Federal share obligated across 489 projects in 12 declared disasters since 2010. The largest category is roads & bridges (76%); roads & bridges took $28.7M.
Dams, disasters & moving ground

02 · Bridges

3 of 37 bridges are rated poor — above the Vermont rate of 4%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Lyndon. Median age 65 years; 8 posted for weight; 3 closed.

30% good, 8% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good11 · 30%
  • Fair23 · 62%
  • Poor3 · 8%

Structures by decade built

051015pre-19101910s1920s1930s1940s1950s1960s1970s1980s2000s
n = 37 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19102
1910s2
1920s6
1930s2
1940s2
1950s4
1960s2
1970s14
1980s1
2000s2

The poor-rated bridges

Bridges rated poor in Lyndon
CarriesOverBuiltDaily traffic
C2002closedHAWKINS BROOK1953700
C2002closedHAWKINS BROOK1928650
C3058postedSO. WHEELOCK BRANCH1881400
Every poor bridge in New England

03 · Ground

Rock turns up a median 18 ft down

From 615 depth-to-rock records inside Lyndon (Vermont DEC well records). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Lyndon's logs reach rock between 8 and 40 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Vermont median.
median 18 ft
VT 20 ft
0204060 ft
0501001502000–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 615 logsSource: Vermont DEC well records
▸ Show the numbers
Depth to rock (ft)Logs
0–577
5–10130
10–20116
20–50161
50–10095
100+36

Rock within 10 ft

38%

of logs (34% across Vermont). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 20% of logs here go past 50 ft.

Mapped landslides

43

15 earth landslide · 10 gully · 10 mass failure · 5 gully head · 3 earth gully. Inventory points from the USGS U.S. Landslide Inventory; many are prehistoric slides mapped from lidar.

04 · Money & permits

1 ground-related permits in the city's open data

Ground-related permits in open data

1

Permits in the city’s open-data portal that mention retaining walls, excavation or foundations. Only a handful of portals are read, so this counts what is published, not everything built.

05 · Next door

Lyndon and the 6 towns that border it

A dash means no data for that layer, not zero.
Lyndon compared with neighbouring towns
TownPoor bridgesRock depth
Lyndon, VT3 / 3718 ft
St. Johnsbury, VT1 / 4312 ft
Danville, VT0 / 1715 ft
Burke, VT0 / 1730 ft
Wheelock, VT1 / 1310 ft
Sutton, VT2 / 520 ft
Kirby, VT0 / 118 ft

Where these numbers come from

Method, sources & caveats

Lyndon is the Census county subdivision 5000541725 (Caledonia County). Every record is placed here by its coordinates, not by the place name the source uses.

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote