Earth Support Corp

Windsor CountyVermont

Hartford, Vermont

Bedrock sits a median 10 ft down across 1,100 logs, shallower than the Vermont median of 20 ft. 1 high-hazard dam is rated in poor or unsatisfactory condition.

Median depth to bedrock

10 ft

middle half 5–36 ft · 1,100 logs

Bridges rated poor

3

of 37 inventoried

Poor high-hazard dams

1

National Inventory of Dams

Mapped landslides

2

USGS inventory points

01 · Ground

Rock is close to the surface: 53% of logs hit it within 10 ft

From 1,100 depth-to-rock records inside Hartford (Vermont DEC well records). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Hartford's logs reach rock between 5 and 36 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Vermont median.
median 10 ft
VT 20 ft
0255075 ft
0501001502002503000–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 1,100 logsSource: Vermont DEC well records
▸ Show the numbers
Depth to rock (ft)Logs
0–5218
5–10279
10–20191
20–50211
50–100129
100+72

Rock within 10 ft

53%

of logs (34% across Vermont). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 16% of logs here go past 50 ft.

Mapped landslides

2

1 debris_flow · 1 gully. Inventory points from the USGS U.S. Landslide Inventory; many are prehistoric slides mapped from lidar.

02 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Windsor County-wide context, not a Hartford number.
High-hazard dams in poor condition in Hartford
DamConditionBuilt
Wright ReservoirConnecticut River-TrPoor1930

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Windsor County

$90.5M

Federal share obligated across 1,345 projects in 8 declared disasters since 2010. The largest category is roads & bridges (86%); roads & bridges took $77.4M.
Dams, disasters & moving ground

03 · Bridges

3 of 37 bridges are rated poor — above the Vermont rate of 4%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Hartford. Median age 59 years; 2 posted for weight.

35% good, 8% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good13 · 35%
  • Fair21 · 57%
  • Poor3 · 8%

Structures by decade built

05101520251910s1920s1950s1960s1980s1990s2000s2010s2020s
n = 37 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1910s2
1920s1
1950s1
1960s24
1980s1
1990s1
2000s2
2010s4
2020s1

The poor-rated bridges

Bridges rated poor in Hartford
CarriesOverBuiltDaily traffic
I 00091 MLUS 4 VT 14 NECR WHTR196721,000
US 00004 MLOTTAUQUECHEE RIVER19118,900
C3018postedNEW ENGLAND CENTRAL RR1920300
Every poor bridge in New England

04 · Money & permits

2 ground-related permits in the city's open data

Ground-related permits in open data

2

Permits in the city’s open-data portal that mention retaining walls, excavation or foundations. Only a handful of portals are read, so this counts what is published, not everything built.

05 · Next door

Hartford and the 7 towns that border it

A dash means no data for that layer, not zero.
Hartford compared with neighbouring towns
TownPoor bridgesRock depth
Hartford, VT3 / 3710 ft
Lebanon, NH9 / 5430 ft
Woodstock, VT1 / 3214 ft
Hartland, VT1 / 2410 ft
Norwich, VT2 / 2216 ft
Hanover, NH0 / 1630 ft
Sharon, VT0 / 1410 ft
Pomfret, VT0 / 59 ft

Where these numbers come from

Method, sources & caveats

Hartford is the Census county subdivision 5002732275 (Windsor County). Every record is placed here by its coordinates, not by the place name the source uses.

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote