Barnard, Vermont

Bedrock sits a median 10 ft down across 509 logs, shallower than the Vermont median of 20 ft. 1 high-hazard dam is rated in poor or unsatisfactory condition.

Median depth to bedrock

10 ft

middle half 5–30 ft · 509 logs

Bridges rated poor

2

of 12 inventoried · 1 closed

Poor high-hazard dams

1

National Inventory of Dams

Mapped landslides

3

USGS inventory points

01 · Ground

Rock is close to the surface: 50% of logs hit it within 10 ft

From 509 depth-to-rock records inside Barnard (Vermont DEC well records). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Barnard's logs reach rock between 5 and 30 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Vermont median.
median 10 ft
VT 20 ft
0204060 ft
0204060801001201400–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 509 logsSource: Vermont DEC well records
▸ Show the numbers
Depth to rock (ft)Logs
0–587
5–10131
10–20108
20–50100
50–10067
100+16

Rock within 10 ft

50%

of logs (34% across Vermont). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 15% of logs here go past 50 ft.

Mapped landslides

3

2 landslide · 1 gully. Inventory points from the USGS U.S. Landslide Inventory; many are prehistoric slides mapped from lidar.

02 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Windsor County-wide context, not a Barnard number.
High-hazard dams in poor condition in Barnard
DamConditionBuilt
Silver LakePond BrookPoor1968

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Windsor County

$90.5M

Federal share obligated across 1,345 projects in 8 declared disasters since 2010. The largest category is roads & bridges (86%); roads & bridges took $77.4M.
Dams, disasters & moving ground

03 · Bridges

2 of 12 bridges are rated poor — above the Vermont rate of 4%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Barnard. Median age 49 years; 1 posted for weight; 1 closed.

67% good, 17% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good8 · 67%
  • Fair2 · 17%
  • Poor2 · 17%
n = 12 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1940s1
1950s1
1970s5
1980s2
1990s1
2010s2

The poor-rated bridges

Bridges rated poor in Barnard
CarriesOverBuiltDaily traffic
C3047LOCUST CREEK197710
C4046closedLOCUST CREEK198710
Every poor bridge in New England

04 · Next door

Barnard and the 5 towns that border it

A dash means no data for that layer, not zero.
Barnard compared with neighbouring towns
TownPoor bridgesRock depth
Barnard, VT2 / 1210 ft
Bridgewater, VT1 / 3820 ft
Bethel, VT0 / 2322 ft
Royalton, VT5 / 2015 ft
Stockbridge, VT1 / 1630 ft
Pomfret, VT0 / 59 ft

Where these numbers come from

Method, sources & caveats

Barnard is the Census county subdivision 5002702725 (Windsor County). Every record is placed here by its coordinates, not by the place name the source uses.

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.