Earth Support Corp

York CountyMaine

North Berwick, Maine

Bedrock sits a median 20 ft down across 323 logs, deeper than the Maine median of 15 ft. None of its 8 inventoried bridges is rated poor.

Median depth to bedrock

20 ft

middle half 10–38 ft · 323 logs

Bridges rated poor

0

of 8 inventoried

FEMA repair $, York County

$46.8M

federal share since 2010 · county-wide

01 · Ground

Rock turns up a median 20 ft down

From 323 depth-to-rock records inside North Berwick (Maine Geological Survey wells database). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of North Berwick's logs reach rock between 10 and 38 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Maine median.
median 20 ft
ME 15 ft
02040 ft
0204060801001200–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 323 logsSource: Maine Geological Survey wells database
▸ Show the numbers
Depth to rock (ft)Logs
0–512
5–1053
10–2095
20–50118
50–10039
100+6

Rock within 10 ft

28%

of logs (40% across Maine). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 12% of logs here go past 50 ft.

02 · Bridges

None of North Berwick's 8 bridges is rated poor

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside North Berwick. Median age 62 years.

13% good, 0% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good1 · 13%
  • Fair7 · 88%
  • Poor0 · 0%
n = 8 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1920s1
1950s2
1960s2
1970s2
2020s1

03 · Dams & disasters

York County has drawn $46.8M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is York County-wide context, not a North Berwick number.

FEMA Public Assistance, York County

$46.8M

Federal share obligated across 1,017 projects in 12 declared disasters since 2010. The largest category is parks & recreation (39%); roads & bridges took $5.3M.
Dams, disasters & moving ground

04 · Next door

North Berwick and the 5 towns that border it

A dash means no data for that layer, not zero.
North Berwick compared with neighbouring towns
TownPoor bridgesRock depth
North Berwick, ME0 / 820 ft
Wells, ME0 / 2316 ft
Lebanon, ME3 / 1316 ft
Sanford, ME1 / 1228 ft
South Berwick, ME3 / 1112 ft
Berwick, ME3 / 1120 ft

Where these numbers come from

Method, sources & caveats

North Berwick is the Census county subdivision 2303150325 (York County). Every record is placed here by its coordinates, not by the place name the source uses.

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote