The town has won $6.9M in state resilience grants across 5 awards. Bedrock sits a median 24 ft down across 172 logs, close to the Massachusetts median of 24 ft.

Median depth to bedrock

24 ft

middle half 8–70 ft · 172 logs

Bridges rated poor

1

of 34 inventoried

State resilience grants

$6.9M

5 awards on file

Construction projects

53

median $3.7M · public bid results

01 · Money & permits

$6.9M in state resilience grants, 5 awards

State resilience grant awards in Quincy
ProjectYearAward
Adams Shore Seawall RepairFY2020$3.0M
Manet Avenue and Babcock Street Seawall RepairFY2021$3.0M
Adams Shore Houghs Neck Seawall Repair DesignFY2017$441K
Houghs Neck Seawalls DesignFY2018$225K
Houghs Neck Seawalls Design Phase 2FY2019$225K

Public construction projects

53

Median estimated value $3.7M, middle half $2.1M–$14.2M, against $1.5M across Massachusetts. Capped total $665M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

02 · Ground

Rock turns up a median 24 ft down

From 172 depth-to-rock records inside Quincy (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Quincy's logs reach rock between 8 and 70 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 24 ft
MA 24 ft
050100 ft
010203040500–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 172 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–524
5–1022
10–2034
20–5029
50–10041
100+22

Rock within 10 ft

31%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 36% of logs here go past 50 ft.

03 · Bridges

1 of 34 bridges are rated poor — below the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Quincy. Median age 57 years.

12% good, 3% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good4 · 12%
  • Fair29 · 85%
  • Poor1 · 3%

Structures by decade built

02468101930s1950s1960s1970s1980s1990s2000s2010s
n = 34 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
1930s1
1950s10
1960s7
1970s8
1980s4
1990s1
2000s2
2010s1

The poor-rated bridges

Bridges rated poor in Quincy
CarriesOverBuiltDaily traffic
STEDMAN STI 93 /US1/ST319543,103
Every poor bridge in New England

04 · Dams & disasters

Norfolk County has drawn $90.4M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Norfolk County-wide context, not a Quincy number.

FEMA Public Assistance, Norfolk County

$90.4M

Federal share obligated across 939 projects in 11 declared disasters since 2010. The largest category is emergency protective measures (88%); roads & bridges took $2.6M.
Dams, disasters & moving ground

05 · Next door

Quincy and the 5 towns that border it

A dash means no data for that layer, not zero.
Quincy compared with neighbouring towns
TownPoor bridgesRock depth
Quincy, MA1 / 3424 ft
Boston, MA41 / 40492 ft
Braintree Town, MA5 / 4315 ft
Weymouth Town, MA0 / 1524 ft
Milton, MA1 / 1340 ft
Randolph Town, MA1 / 822 ft

Where these numbers come from

Method, sources & caveats

Quincy is the Census county subdivision 2502155745 (Norfolk County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.