Earth Support Corp

Hampshire CountyMassachusetts

Northampton, Massachusetts

5 of its 47 inventoried bridges are rated poor (11%, against 9% statewide). Bedrock sits a median 29 ft down across 107 logs, deeper than the Massachusetts median of 24 ft.

Median depth to bedrock

29 ft

middle half 10–77 ft · 107 logs

Bridges rated poor

5

of 47 inventoried

State resilience grants

$2.1M

7 awards on file

Construction projects

39

median $1.3M · public bid results

01 · Bridges

5 of 47 bridges are rated poor — about the same as the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Northampton. Median age 61 years; 5 posted for weight.

26% good, 11% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good12 · 26%
  • Fair30 · 64%
  • Poor5 · 11%

Structures by decade built

051015pre-19101920s1930s1940s1950s1960s1970s1990s2000s2010s2020s
n = 47 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19106
1920s4
1930s2
1940s3
1950s4
1960s14
1970s1
1990s3
2000s3
2010s3
2020s4

The poor-rated bridges

Bridges rated poor in Northampton
CarriesOverBuiltDaily traffic
I 91 SB OFF RAMPUS 5 /ST10/N KING ST19633,497
CLEMENT STpostedMILL RIVER18942,400
MAIN ST LEEDS CHANNEL MILL RIV18502,008
MAIN ST LEEDN CHANNEL MILL RIV18502,008
OLD SPFLD RDMILL RIVER1940100
Every poor bridge in New England

02 · Ground

Rock turns up a median 29 ft down

From 107 depth-to-rock records inside Northampton (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Northampton's logs reach rock between 10 and 77 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 29 ft
MA 24 ft
050100150 ft
05101520250–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 107 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–512
5–1013
10–2019
20–5022
50–10019
100+22

Rock within 10 ft

25%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 36% of logs here go past 50 ft.

03 · Money & permits

39 construction projects on file, median $1.3M — at or below the state's $1.5M

State resilience grant awards in Northampton
ProjectYearAward
Upper Roberts Meadow Reservoir Dam RemovalFY2018$634K
Northampton Designs with Nature to Reduce Storm DamageFY2018$400K
Protecting Downtown: Northampton’s Flood Control LeveesFY2019$315K
Ryan and West Whately Reservoir Dams Repair DesignFY2019$250K
FY24 Ryan and West Whately Reservoir Dams Repair Design and PermitFY2024$250K
Francis P. Ryan Reservoir Dam and West Whately Reservoir Dam Rehabilitation DesignFY2025$221K
Upper Roberts Meadow Reservoir Dam RemovalFY2014$75K

Public construction projects

39

Median estimated value $1.3M, middle half $495K–$2.3M, against $1.5M across Massachusetts. Capped total $101M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

04 · Dams & disasters

Hampshire County has drawn $37.2M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Hampshire County-wide context, not a Northampton number.

FEMA Public Assistance, Hampshire County

$37.2M

Federal share obligated across 283 projects in 5 declared disasters since 2010. The largest category is emergency protective measures (91%); roads & bridges took $453K.
Dams, disasters & moving ground

05 · Next door

Northampton and the 5 towns that border it

A dash means no data for that layer, not zero.
Northampton compared with neighbouring towns
TownPoor bridgesRock depth
Northampton, MA5 / 4729 ft
Easthampton, MA3 / 1756 ft
Williamsburg, MA1 / 1745 ft
Hatfield, MA1 / 1544 ft
Westhampton, MA0 / 1330 ft
Hadley, MA1 / 9125 ft

Where these numbers come from

Method, sources & caveats

Northampton is the Census county subdivision 2501546330 (Hampshire County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote