Earth Support Corp

Norfolk CountyMassachusetts

Needham, Massachusetts

1 high-hazard dam is rated in poor or unsatisfactory condition. Bedrock sits a median 15 ft down across 174 logs, shallower than the Massachusetts median of 24 ft.

Median depth to bedrock

15 ft

middle half 10–26 ft · 174 logs

Bridges rated poor

2

of 14 inventoried

Poor high-hazard dams

1

National Inventory of Dams

Construction projects

26

median $536K · public bid results

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Norfolk County-wide context, not a Needham number.
High-hazard dams in poor condition in Needham
DamConditionBuilt
Sabrina Lake West DikeUnnamed tributary to Charles RiverUnsatisfactory1870

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Norfolk County

$90.4M

Federal share obligated across 939 projects in 11 declared disasters since 2010. The largest category is emergency protective measures (88%); roads & bridges took $2.6M.
Dams, disasters & moving ground

02 · Ground

Rock turns up a median 15 ft down

From 174 depth-to-rock records inside Needham (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Needham's logs reach rock between 10 and 26 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 15 ft
MA 24 ft
02040 ft
0204060800–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 174 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–515
5–1026
10–2070
20–5044
50–10013
100+6

Rock within 10 ft

26%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 10% of logs here go past 50 ft.

03 · Bridges

2 of 14 bridges are rated poor — above the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Needham. Median age 88 years; 1 posted for weight.

43% good, 14% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good6 · 43%
  • Fair6 · 43%
  • Poor2 · 14%
n = 14 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19105
1910s1
1920s1
1950s2
1970s1
2010s4

The poor-rated bridges

Bridges rated poor in Needham
CarriesOverBuiltDaily traffic
CHESTNUT STCHARLES RIVER192210,100
HIGH ROCK STBCRR ABANDONED19166,600
Every poor bridge in New England

04 · Money & permits

26 construction projects on file, median $536K — at or below the state's $1.5M

Public construction projects

26

Median estimated value $536K, middle half $235K–$2.1M, against $1.5M across Massachusetts. Capped total $54.5M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

05 · Next door

Needham and the 6 towns that border it

A dash means no data for that layer, not zero.
Needham compared with neighbouring towns
TownPoor bridgesRock depth
Needham, MA2 / 1415 ft
Boston, MA41 / 40492 ft
Newton, MA10 / 4930 ft
Dedham, MA2 / 2314 ft
Wellesley, MA0 / 1725 ft
Westwood, MA0 / 615 ft
Dover, MA0 / 521 ft

Where these numbers come from

Method, sources & caveats

Needham is the Census county subdivision 2502144105 (Norfolk County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly