Winchester, Massachusetts

1 high-hazard dam is rated in poor or unsatisfactory condition. Bedrock sits a median 18 ft down across 101 logs, shallower than the Massachusetts median of 24 ft.

Median depth to bedrock

18 ft

middle half 10–50 ft · 101 logs

Bridges rated poor

0

of 13 inventoried

State resilience grants

$1.0M

1 award on file

Poor high-hazard dams

1

National Inventory of Dams

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Middlesex County-wide context, not a Winchester number.
High-hazard dams in poor condition in Winchester
DamConditionBuilt
North Reservoir DamSawmill BrookPoor1874

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Middlesex County

$656M

Federal share obligated across 1,729 projects in 12 declared disasters since 2010. The largest category is emergency protective measures (97%); roads & bridges took $1.2M.
Dams, disasters & moving ground

02 · Ground

Rock turns up a median 18 ft down

From 101 depth-to-rock records inside Winchester (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Winchester's logs reach rock between 10 and 50 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 18 ft
MA 24 ft
050100 ft
0510152025300–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 101 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–510
5–1015
10–2026
20–5023
50–1009
100+18

Rock within 10 ft

34%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 24% of logs here go past 50 ft.

03 · Money & permits

16 construction projects on file, median $1.2M — at or below the state's $1.5M

State resilience grant awards in Winchester
ProjectYearAward
South Reservoir Dam RepairFY2025$1.0M

Public construction projects

16

Median estimated value $1.2M, middle half $196K–$4.5M, against $1.5M across Massachusetts. Capped total $93.5M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

04 · Bridges

None of Winchester's 13 bridges is rated poor

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Winchester. Median age 91 years; 1 posted for weight.

23% good, 0% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good3 · 23%
  • Fair10 · 77%
  • Poor0 · 0%
n = 13 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19102
1910s2
1920s1
1930s2
1950s3
1960s1
2020s2

05 · Next door

Winchester and the 5 towns that border it

A dash means no data for that layer, not zero.
Winchester compared with neighbouring towns
TownPoor bridgesRock depth
Winchester, MA0 / 1318 ft
Medford, MA2 / 2930 ft
Woburn, MA2 / 2122 ft
Lexington, MA2 / 1420 ft
Arlington, MA3 / 910 ft
Stoneham, MA1 / 310 ft

Where these numbers come from

Method, sources & caveats

Winchester is the Census county subdivision 2501780510 (Middlesex County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote