1 high-hazard dam is rated in poor or unsatisfactory condition. Bedrock sits a median 40 ft down across 201 logs, deeper than the Massachusetts median of 24 ft.

Median depth to bedrock

40 ft

middle half 20–70 ft · 201 logs

Bridges rated poor

0

of 18 inventoried

State resilience grants

$714K

4 awards on file

Poor high-hazard dams

1

National Inventory of Dams

01 · Dams & disasters

1 high-hazard dam needs work

FEMA Public Assistance is reported by county, so the figure below is Norfolk County-wide context, not a Walpole number.
High-hazard dams in poor condition in Walpole
DamConditionBuilt
Bird Pond DamNeponset RiverPoor1800

High hazard potential means failure would probably cost lives — it rates the consequences, not the dam’s condition.

FEMA Public Assistance, Norfolk County

$90.4M

Federal share obligated across 939 projects in 11 declared disasters since 2010. The largest category is emergency protective measures (88%); roads & bridges took $2.6M.
Dams, disasters & moving ground

02 · Ground

Rock turns up a median 40 ft down

From 201 depth-to-rock records inside Walpole (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Walpole's logs reach rock between 20 and 70 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 40 ft
MA 24 ft
050 ft
0204060800–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 201 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–52
5–1013
10–2035
20–5070
50–10063
100+18

Rock within 10 ft

11%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 37% of logs here go past 50 ft.

Mapped landslides

1

1 landslide. Inventory points from the USGS U.S. Landslide Inventory; many are prehistoric slides mapped from lidar.

03 · Money & permits

16 construction projects on file, median $700K — at or below the state's $1.5M

State resilience grant awards in Walpole
ProjectYearAward
Turner Pond Dam RepairFY2016$200K
Willet Pond Dam Repair Design (Phase 2)FY2020$176K
Willett Pond Dam Repair DesignFY2019$172K
Culvert Assessment and Green Infrastructure Survey, Walpole, MAFY2019$166K

Public construction projects

16

Median estimated value $700K, middle half $346K–$2.6M, against $1.5M across Massachusetts. Capped total $143M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

04 · Bridges

None of Walpole's 18 bridges is rated poor

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Walpole. Median age 70 years; 2 posted for weight.

39% good, 0% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good7 · 39%
  • Fair11 · 61%
  • Poor0 · 0%

Structures by decade built

0123pre-19101910s1920s1930s1950s1960s1980s1990s2020s
n = 18 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19103
1910s1
1920s2
1930s1
1950s3
1960s2
1980s3
1990s2
2020s1

05 · Next door

Walpole and the 7 towns that border it

A dash means no data for that layer, not zero.
Walpole compared with neighbouring towns
TownPoor bridgesRock depth
Walpole, MA0 / 1840 ft
Foxborough, MA1 / 2322 ft
Sharon, MA0 / 1624 ft
Norwood, MA0 / 1522 ft
Medfield, MA0 / 618 ft
Westwood, MA0 / 615 ft
Dover, MA0 / 521 ft
Norfolk, MA1 / 425 ft

Where these numbers come from

Method, sources & caveats

Walpole is the Census county subdivision 2502172495 (Norfolk County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.