Earth Support Corp

Bristol CountyMassachusetts

Fall River, Massachusetts

Bedrock sits a median 22 ft down across 144 logs, close to the Massachusetts median of 24 ft. 2 of its 58 inventoried bridges are rated poor (3%, against 9% statewide).

Median depth to bedrock

22 ft

middle half 15–40 ft · 144 logs

Bridges rated poor

2

of 58 inventoried

State resilience grants

$1.6M

6 awards on file

Construction projects

25

median $1.4M · public bid results

01 · Ground

Rock turns up a median 22 ft down

From 144 depth-to-rock records inside Fall River (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Fall River's logs reach rock between 15 and 40 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 22 ft
MA 24 ft
0204060 ft
01020304050600–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 144 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–56
5–1012
10–2041
20–5056
50–10019
100+10

Rock within 10 ft

19%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 15% of logs here go past 50 ft.

02 · Bridges

2 of 58 bridges are rated poor — below the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Fall River. Median age 63 years; 1 posted for weight.

34% good, 3% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good20 · 34%
  • Fair36 · 62%
  • Poor2 · 3%

Structures by decade built

0510152025pre-19101910s1950s1960s1970s2010s2020s
n = 58 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19109
1910s1
1950s10
1960s24
1970s2
2010s10
2020s2

The poor-rated bridges

Bridges rated poor in Fall River
CarriesOverBuiltDaily traffic
N MAIN STST 79195812,142
JEFFERSON STpostedSUCKER BROOK1850390
Every poor bridge in New England

03 · Money & permits

25 construction projects on file, median $1.4M — at or below the state's $1.5M

State resilience grant awards in Fall River
ProjectYearAward
Copicut Dam RepairFY2015$1.0M
Rattlesnake Brook Dam RemovalFY2017$170K
Sawdy Pond Dam Repair Design and PermitFY2023$149K
Upper Lake Noquochoke Dam Removal DesignFY2020$128K
FY24 Upper Lake Noquochoke Dam RemovalFY2024$101K
Rattlesnake Brook Dam Removal DesignFY2014$46K

Public construction projects

25

Median estimated value $1.4M, middle half $672K–$4.9M, against $1.5M across Massachusetts. Capped total $204M (each project counted at no more than $100M). Public bid records compiled June 2026, heavy on 2021–22 — a sample, not an annual market.

04 · Dams & disasters

Bristol County has drawn $112M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Bristol County-wide context, not a Fall River number.

FEMA Public Assistance, Bristol County

$112M

Federal share obligated across 770 projects in 11 declared disasters since 2010. The largest category is emergency protective measures (90%); roads & bridges took $3.6M.
Dams, disasters & moving ground

05 · Next door

Fall River and the 5 towns that border it

A dash means no data for that layer, not zero.
Fall River compared with neighbouring towns
TownPoor bridgesRock depth
Fall River, MA2 / 5822 ft
Westport, MA0 / 1830 ft
Freetown, MA3 / 1538 ft
Tiverton, RI2 / 12
Dartmouth, MA0 / 1125 ft
Somerset, MA0 / 720 ft

Where these numbers come from

Method, sources & caveats

Fall River is the Census county subdivision 2500523000 (Bristol County). Every record is placed here by its coordinates, not by the place name the source uses. Construction-project figures come from Massachusetts public bid results, published as town-level counts, medians and capped totals (n ≥ 10).

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote