Earth Support Corp

Franklin CountyMassachusetts

Deerfield, Massachusetts

Bedrock sits a median 40 ft down across 60 logs, deeper than the Massachusetts median of 24 ft. 1 of its 16 inventoried bridges is rated poor (6%, against 9% statewide).

Median depth to bedrock

40 ft

middle half 21–106 ft · 60 logs

Bridges rated poor

1

of 16 inventoried · 1 closed

State resilience grants

$1.1M

4 awards on file

FEMA repair $, Franklin County

$12.2M

federal share since 2010 · county-wide

01 · Ground

Rock turns up a median 40 ft down

From 60 depth-to-rock records inside Deerfield (MassGIS / MGS borings & well logs). Logs cluster where people drill wells and bore for roads, so treat this as the town’s pattern, not a site answer.

Half of Deerfield's logs reach rock between 21 and 106 ft

Depth to bedrock: 10th–90th percentile whisker, middle-half box, median tick; dashed line = Massachusetts median.
median 40 ft
MA 24 ft
050100150 ft
05101520250–5 ft5–10 ft10–20 ft20–50 ft50–100 ft100+ ft
n = 60 logsSource: MassGIS / MGS borings & well logs
▸ Show the numbers
Depth to rock (ft)Logs
0–52
5–101
10–209
20–5021
50–10011
100+16

Rock within 10 ft

8%

of logs (23% across Massachusetts). Shallow rock means ledge in excavations, refusal for driven piles and rock anchors rather than soil nails; deep ground means taller shoring and more groundwater. 43% of logs here go past 50 ft.

02 · Money & permits

$1.1M in state resilience grants, 4 awards

State resilience grant awards in Deerfield
ProjectYearAward
Flood Resiliency Through Green Infrastructure in DeerfieldFY2020$572K
Reducing Flooding Vulnerability in DeerfieldFY2019$278K
Bloody Brook Resilience Hydrologic/Hydraulic ModelingFY2025$170K
Municipal Vulnerability Preparedness Plan ImplementationFY2018$47K

03 · Bridges

1 of 16 bridges are rated poor — below the Massachusetts rate of 9%

Every highway bridge and large culvert in the 2025 National Bridge Inventory that stands inside Deerfield. Median age 61 years; 1 posted for weight; 1 closed.

50% good, 6% poor

FHWA good / fair / poor rating — the lowest of deck, superstructure, substructure or culvert.
  • Good8 · 50%
  • Fair7 · 44%
  • Poor1 · 6%

Structures by decade built

01234pre-19101910s1930s1940s1950s1960s2000s2010s2020s
n = 16 structuresSource: FHWA National Bridge Inventory 2025
▸ Show the numbers
BuiltStructures
pre-19101
1910s2
1930s1
1940s1
1950s1
1960s4
2000s1
2010s4
2020s1

The poor-rated bridges

Bridges rated poor in Deerfield
CarriesOverBuiltDaily traffic
MAIN STclosedGWRR19034,008
Every poor bridge in New England

04 · Dams & disasters

Franklin County has drawn $12.2M in federal disaster repair since 2010

FEMA Public Assistance is reported by county, so the figure below is Franklin County-wide context, not a Deerfield number.

FEMA Public Assistance, Franklin County

$12.2M

Federal share obligated across 367 projects in 4 declared disasters since 2010. The largest category is roads & bridges (44%); roads & bridges took $5.4M.
Dams, disasters & moving ground

05 · Next door

Deerfield and the 6 towns that border it

A dash means no data for that layer, not zero.
Deerfield compared with neighbouring towns
TownPoor bridgesRock depth
Deerfield, MA1 / 1640 ft
Greenfield, MA6 / 4639 ft
Montague, MA5 / 1934 ft
Conway, MA4 / 1728 ft
Whately, MA2 / 1643 ft
Shelburne, MA1 / 618 ft
Sunderland, MA0 / 150 ft

Where these numbers come from

Method, sources & caveats

Deerfield is the Census county subdivision 2501116670 (Franklin County). Every record is placed here by its coordinates, not by the place name the source uses.

  • Towns are Census county subdivisions: cities, towns, plantations, and Maine/New Hampshire unorganized territories and townships. Every record is placed in a town by its coordinates (point-in-polygon), not by the source's own place label — so a bridge in Roxbury counts for Boston and a well in 'North Waltham' counts for Waltham.
  • Bridges: FHWA NBI 2025, highway structures ≥ 20 ft including large culverts. 'Poor' is FHWA's good/fair/poor rating (lowest of deck, superstructure, substructure or culvert ≤ 4). Percent-poor is shown only for towns with at least 5 structures.
  • Depth to bedrock is the median of driller- and boring-reported depths in the town, shown only where at least 10 logs exist. Water-well logs over-sample rural lots and hilltops; one town median never describes a particular site.
  • Bedrock depths use the same state databases and filters as the Bedrock & soils module (bedrock wells and borings that reached rock, 0 < depth ≤ 400 ft, exact re-filings dropped), but every log is placed in a town by its coordinates rather than the driller's town field, so town counts can differ slightly between the two pages. Connecticut and Rhode Island have no statewide public well-log database with depths.
  • Dams: only high-hazard-potential dams whose latest condition assessment is Poor or Unsatisfactory are counted (live NID). Connecticut and Rhode Island assessments may lag.
  • FEMA Public Assistance dollars are federal share obligated for disasters declared since 2010, reported by county — they are county context, not a town figure.
  • Grant awards are Massachusetts only (EEA Dam & Seawall program, MVP Action grants, CZM Coastal Resilience). Other states' programs are not yet included.
  • Ground-related permit counts cover only the municipal portals the pipeline reads (Boston, Cambridge, Somerville, Worcester, Framingham, Providence, Portsmouth, Hartford and a few others) — an absent count means 'not covered', not zero.
Data as of
Sep 11, 2026
Generated
Sep 11, 2026
Records
367,748
Refresh
Live pull · weekly

Published by Earth Support Corp as a public resource. Regional statistics for planning and curiosity. They are not an engineering report, a bid recommendation or a statement about any particular site, firm or project. Spot an error? Tell us and we will correct it. Full method: methodology.

CallStart Quote