Earth Support Corp

How we’d build it

Worked examples of how we think through a site: what the ground and the buildings next door allow, which support fits, the order of work, who carries what, and a budget range priced from our published book. Each one is a composite, so you can see the reasoning without anyone’s project being on show.

Illustrative example — composite site, not a completed ESC project.

  • Soldier pile & lagging · Cantilever wall · Slope where there's room

    Shoring an infill basement with the neighbor four feet away

    A new four-storey building with a full basement on a double-width lot, an old masonry neighbor four feet past the line and open ground elsewhere. How we'd put a wall only where one is needed — drilled, cantilevered, nothing under the neighbor — and lay the rest of the cut back.

    How we’d approach it
  • Underpinning · Party walls · Restricted access

    Underpinning two party walls in a hilltop rowhouse, by hand

    A brick rowhouse near the top of a drumlin, attached on both sides, with the rear of its cellar coming down about three and a half feet. How we'd underpin the lowered length of both party walls with hand-dug pits, working in through the front door.

    How we’d approach it
  • Rock removal · Line drilling · Vibration control

    Taking out ledge five feet from an occupied brick building

    A new building's basement cuts into hard ledge a few feet from a c. 1900 masonry building that stays occupied. How we'd line-drill the face nearest the building and split the rock beside it, and leave the hammer for the far side of the lot.

    How we’d approach it

Send us the address and drawings

We'll send back how we'd approach yours: the support we'd use, the order of work, and a budget range from our published prices. We work for builders, GCs and developers.

Or email plans to bids@earthsupportcorp.com

CallEmailStart Quote