Soldier Pile & Lagging Wall, 44 Russell St
Five new homes with basements are going in on a Cambridge lot, and the excavation runs along a side lot line with a three-story house about 3 ft beyond it. The ground is sand over soft marine clay, and groundwater sits 10–11 ft down, about at the bottom of the cut.
The problem
Five new homes with basements are going in on a Cambridge lot, and the excavation runs along a side lot line with a three-story house about 3 ft beyond it. The ground is sand over soft marine clay, and groundwater sits 10–11 ft down, about at the bottom of the cut.
The engineered approach
Eighteen HP12x53 soldier piles, each up to 20 ft long, go into 24 in drilled holes at 4 ft centers along about 68 lf of wall, with lean concrete around the embedded length and flowable fill above. The piles are drilled rather than driven to keep vibration away from the neighbors, and timber lagging goes in between the flanges as the builder digs down in lifts of no more than 4 ft. The wall is a cantilever, with no tiebacks or bracing.
Where it stands
- Underway now: one lot-line wall, 18 soldier piles
- Drilled, not driven, beside a three-story neighbor
- Cantilevered: nothing anchored under the neighbor's lot
How we're building it
A schematic section of the earth support system for this Cambridge job. Scroll to build it in construction order, or select a callout to read the detail.
Callouts
Select a numbered part below to read what it is and what it does.
- The wall runs along the side lot line, and the neighbor's three-story house stands about 3 ft beyond it. As a cantilever, the wall puts nothing under the neighbor's lot: no tiebacks, no bracing, no wales.
- Each pile goes into a 24 in drilled hole instead of being driven, which keeps vibration away from the houses next door.
- Eighteen HP12x53 steel H-piles at 4 ft centers along about 68 lf of wall, each up to 20 ft long. With nothing bracing it, each pile is a cantilever: the length below the cut holds up the length above it.
- Lean concrete fills the hole around the embedded length of the pile. Above it, excavatable flowable fill locks the pile in place but can still be dug away in front of it as the cut comes down.
- The builder takes the cut down in lifts of no more than 4 ft, and ESC sets 3 in timber lagging between the pile flanges as each lift opens, so the soil between piles is never left open for long.
- Two borings to 47 ft found about 2 ft of fill over medium dense sand to 16–21 ft, a thin crust, then soft marine clay, with no rock. Groundwater is 10–11 ft down, about at the bottom of the cut, so dewatering by others keeps it at least 1 ft below.
- Everything drawn dashed is by others: the excavation, the dewatering and the new homes. ESC's scope is the piles, the fill in the holes and the lagging.